首页> 外文期刊>The Railway Magazine >Peak Rail And Nr Agree Matlock Link
【24h】

Peak Rail And Nr Agree Matlock Link

机译:Peak Rail和Nr同意Matlock Link

获取原文
获取原文并翻译 | 示例
       

摘要

After many years of waiting, Peak Rail received the Christmas present it wanted on December 24 when Network Rail formally offered a 50-year lease enabling trains to run into Matlock station. The station's disused down platform has been offered to PR for a peppercorn rent. NR has also confirmed its agreement for the heritage line to access main line metals at Matlock Riverside, meaning that PR can share the station with main line trains. Peak Rail will receive a £25,000 grant from Derbyshire County Council to assist with refurbishment of the overgrown platform, which has been disused since the 1970s. Sainsbury's, which built a superstore on the site of nearby Cawdor quarry (ironically resulting in the lifting of the original NR link in 2007 to gain access) will finance a ramp enabling access to the platform, the footbridge having been removed long ago. Part of the agreement is that Peak Rail must provide passenger waiting facilities, although these will initially be in fairly basic form. In a departure from normal practice, NR says it will allow Peak Rail volunteers to slew the tracks at Riverside, enabling reconnection of the heritage line to the end of the NR-owned loop line, thus producing what amounts to a three quarter mile extension of Peak Rail plus a link to the national network. When running round trains. Peak Rail locomotives will be on NR metals when using the loop. The first trains are likely to run during 2010.
机译:经过多年的等待,Peak Rail在12月24日收到了想要的圣诞节礼物,当时Network Rail正式提供了为期50年的租约,使火车可以进入Matlock站。该电台废弃的停放平台已提供给PR,用于租用花椒。 NR还确认了其传统线路可以进入Matlock Riverside的主线金属的协议,这意味着PR可以与主线列车共享该站点。匹克铁路公司(Peak Rail)将获得德比郡县议会(Derbyshire County Council)的25,000英镑赠款,以协助翻修这座从1970年代起就不再使用的长满的平台。塞恩斯伯里(Sainsbury's)在附近的卡多(Cawdor)采石场现场建造了一家大型超市(具有讽刺意味的是,该桥在2007年取消了原始的NR链以获取通行权),将为修建通往该平台的通行道提供资金,该行人天桥早已拆除。该协议的一部分是,Peak Rail必须提供旅客候车设施,尽管这些设施最初将是相当基本的形式。 NR表示,与正常做法不同的是,它将允许Peak Rail志愿者在Riverside上转换轨道,从而使遗产线路重新连接到NR拥有的环路的末端,从而产生相当于四分之三英里的延伸。尖峰铁路以及到国家网络的链接。在运行火车时。使用环路时,峰值铁路机车将使用NR金属。首批列车可能会在2010年运行。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号