首页> 外文期刊>Railway magazine >How we built a level crossing in a town centre
【24h】

How we built a level crossing in a town centre

机译:我们如何在市中心建造平交路口

获取原文
获取原文并翻译 | 示例
           

摘要

It was October 2007 and Network Rail had decided to hold its annual retirement and long service day on the North Norfolk Railway. Hosting senior Anglia Region managers in a hotel bar the night before, NNR director Steven Ashling half-jokingly suggested laying a temporary track across the road at Sheringham and running a train over it as a bit of a stunt!rnIt was, he says, like asking a girl out for the first time. You do it while you have a drink in your hand so that the pain of rejection is masked by the alcohol.
机译:那是2007年10月,Network Rail决定在North Norfolk Railway举行年度退休和长期服务日。 NNR总监史蒂芬·阿什林(Steven Ashli​​ng)前天晚上在酒店酒吧接待了安格利亚地区的高级经理,他开玩笑地建议在谢林汉姆(Sheringham)的马路对面铺设一条临时的小路,并在上面开一列火车,这有点st头!第一次问一个女孩。您可以在手边喝酒的时候去做,以使拒绝的痛苦被酒精掩盖。

著录项

  • 来源
    《Railway magazine》 |2010年第1310期|p.42-45|共4页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号