首页> 外文期刊>Railway magazine >Super Express Trains are put on hold
【24h】

Super Express Trains are put on hold

机译:超级快车暂停

获取原文
获取原文并翻译 | 示例
       

摘要

HSTs will continue operating front-line services in Britain for several years longer following a Government decision to defer a ruling on Super Express Trains until after the general election. The SET project, also known as the Intercity Express Programme (IEP), had advanced to such a stage that a preferred bidder, Agility Trains, and a preferred manufacturer, Hitachi, had been selected (RM April 2009) but on February 26, Transport Secretary Lord Adonis said the whole affair was being put on hold.
机译:在政府决定将对特快列车的裁决推迟到大选之后,HST将在英国继续运营前线服务长达数年。 SET项目也称为城际快车计划(IEP),已经发展到这样一个阶段:已选择了优先竞标者Agility Trains和优先制造商Hitachi(2009年4月RM),但在2月26日运输秘书阿多尼斯勋爵说,整个事件被搁置了。

著录项

  • 来源
    《Railway magazine》 |2010年第1309期|p.56|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 01:32:22

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号