首页> 外文期刊>The Railway Magazine >£8.6m appeal to finish FR/WHR
【24h】

£8.6m appeal to finish FR/WHR

机译:m8.6m要求完成FR / WHR

获取原文
获取原文并翻译 | 示例
       

摘要

The Ffestiniog Railway/Welsh Highland Railway launched a major appeal in December linked to the phraselet's Finish The Job'. Having completed Phase 4 - the physical construction of the WHR from Caernarfon to Porthmadog, where it links with the Ffestiniog - the two railways want to move on to Phase 5, for which they need to raise up to £8.6million over the next decade. The money, if raised, will be spent as follows: 1. Widening The Cob for a platform for WHR trains (£700,000) plus track and signalling work (£300,000). 2. New WHR loco shed at Dinas (£700,000) 3. Extending Dinas carriage shed (£300,000) 4. Ten new carriages (£1.2m) 5. Additional WHR loops (£100,000) 6. An infrastructure and maintenance base at Minffordd (£350,000) 7. New loco shed at Boston Lodge (£600,000).
机译:Ffestiniog铁路/威尔士高地铁路在12月发起了一次重大号召,与该短语的“完成工作”相关。两条铁路已完成第四阶段的建设,即从卡那封到波特马多克的WHR的实际建设,并与Ffestiniog相连,这两个铁路都希望进入第五阶段,在接下来的十年中,他们需要筹集860万英镑。如果筹集了这笔钱,将用于以下方面:1.扩建WHR列车平台的库(700,000英镑)以及轨道和信号工作(300,000英镑)。 2.迪纳斯的新WHR机车棚(700,000英镑)3.迪纳斯扩展的马车棚(300,000英镑)4.十辆新车(120万英镑)5.额外的WHR环路(100,000英镑)6. Minffordd的基础设施和维护基地(35万英镑)7.波士顿小屋的新机车(60万英镑)。

著录项

  • 来源
    《The Railway Magazine》 |2011年第1318期|p.11|共1页
  • 作者

    Cliff Thomas;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 01:31:05

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号