首页> 外文期刊>The Railway Magazine >2MT moves from Darlington to GCR for completion... and a 10-year stay
【24h】

2MT moves from Darlington to GCR for completion... and a 10-year stay

机译:2MT从达灵顿(Darlington)移至GCR以完工...并逗留10年

获取原文
获取原文并翻译 | 示例
           

摘要

Partially restored 2MT 2-6-0 No. 78018 is expected to arrive at the Great Central Railway by the end of September. The Darlington Railway Preservation Society has been restoring the loco in the ex-Stockton & Darlington Railway goods shed on the site which encompasses Head of Steam (Darlington Railway Museum) since 1981. The GCR will complete the work at Loughborough and No. 78018 will remain based at the GCR for 10 years, although it will be able to periodically visit other heritage lines.
机译:部分恢复的2MT 2-6-0 No. 78018预计将于9月底到达中央火车站。自1981年以来,达灵顿铁路保护协会一直在修复包括蒸汽头(Darlington铁路博物馆)在内的现场的Stockton&Darl​​ington铁路货物棚中的机车。GCR将完成拉夫堡的工程,而第78018号将保留总部设在GCR已有10年,尽管它可以定期访问其他遗产。

著录项

  • 来源
    《The Railway Magazine》 |2012年第1339期|p.80|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号