首页> 外文期刊>The Railway Magazine >Network Rail to return £310m to Government
【24h】

Network Rail to return £310m to Government

机译:Network Rail将向政府退还3.1亿英镑

获取原文
获取原文并翻译 | 示例
       

摘要

Network Rail is on course to return £310million to the UK and Scottish governments by 2014, NR chief executive David Higgins told the annual general meeting on July 19. The split would be around £250m to the UK and £60m to Scotland. The AGM was informed that infrastructure failures had reduced by 24% since April 2009, punctuality was at 91.6% of meeting target and in 2011/12, 7.3 million trains were run, carrying 1.46 billion passengers - 0.5bn more than the previous year on a million more trains than 10 years ago.
机译:NR首席执行官大卫·希金斯(David Higgins)在7月19日的年度股东大会上表示,到2014年,Network Rail计划将向英国和苏格兰政府返还3.1亿英镑,英国的拆分费用约为2.5亿英镑,苏格兰的拆分费用约为6000万英镑。年度股东大会获悉,自2009年4月以来,基础设施故障减少了24%,守时率达到了目标的91.6%。2011/ 12年度,共运行730万列火车,运送旅客14.6亿人,比上一年增加了5亿。比10年前增加了100万列火车。

著录项

  • 来源
    《The Railway Magazine》 |2012年第1337期|p.9|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 01:30:13

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号