首页> 外文期刊>The Railway Magazine >Rock-fall shuts Gotthard rail route
【24h】

Rock-fall shuts Gotthard rail route

机译:落石使圣哥达铁路关闭

获取原文
获取原文并翻译 | 示例
       

摘要

Rock-Fall on June 5-blocking both tracks south of Erstfeld-closed the Gotthard trans-Alpine route in Switzerland for four weeks until July 2. Work to secure the rock face near the track took several weeks. Extensive diversions were required for the 120-plus freight trains that normally use the Gotthard route, plus Milan to Zurich EuroCity services. The situation wasn't helped by partial closure of the alternative Simplon Tunnel, repairing fire damage from a year ago, and planned maintenance work (plus a freight train derailment) on the alternative Austrian Brenner trans-Alpine route.
机译:6月5日的岩石坠落阻塞了Erstfeld以南的两条轨道,并关闭了瑞士的Gotthard跨阿尔卑斯山脉路线,持续了四个星期,直到7月2日。为保护轨道附近的岩石面花费了几周的时间。通常使用圣哥达路线的120多列货运列车,以及米兰到苏黎世欧洲城市的服务,都需要进行大规模改道。替代性的Simplon隧道被部分关闭,一年前修复的火灾损失以及替代性的奥地利布伦纳跨阿尔卑斯山脉路线的计划维护工作(加上货运列车脱轨),这种情况并没有得到解决。

著录项

  • 来源
    《The Railway Magazine》 |2012年第1337期|p.92|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 01:30:13

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号