Remodelling of the track at the north end of the Bluebell Railway's Kingscote station was completed on June 1. Work centred on replacing the old turnout to the run-round loop, with a new throat joining the Kingscote platform roads to the East Grinstead single line section, in an equal T layout to 25mph standard, ready for opening of the northern extension.
展开▼