首页> 外文期刊>The Railway Magazine >Cosmetic restoration of TVR No. 28 within touching distance
【24h】

Cosmetic restoration of TVR No. 28 within touching distance

机译:在接触距离之内即可恢复TVR 28的外观

获取原文
获取原文并翻译 | 示例
       

摘要

Around half the sum needed to clear the way for Llangollen Engineering to start cosmetic restoration of NRM-owned 0-6-2TTaff Vale Railway No. 28 has been raised. Another £2,500 will enable work to start, although further donations are needed to ensure progress is maintained. When cosmetic restoration of TVR No. 28 is finished it will go to the Gwili Railway for display at Llwyfan Cerrig with the Gwili's restored Taff Vale coaches (RM April). Completing this phase of the Welsh Train Project is costed at about £10,000.
机译:已经筹集了大约一半的费用,为Llangollen Engineering公司开始对NRM拥有的0-6-2TTaff Vale铁路28号进行整容修复铺平了道路。另外的2500英镑将使工作能够开始,尽管还需要进一步的捐赠以确保进度。 TVR No. 28的外观修复完成后,将与Gwili修复后的Taff Vale教练一起前往Gwili铁路在Llwyfan Cerrig展出(4月RM)。完成威尔士火车项目的这一阶段的费用约为10,000英镑。

著录项

  • 来源
    《The Railway Magazine》 |2013年第1351期|71-71|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 01:29:16

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号