首页> 外文期刊>The Railway Magazine >Plans submitted for Ordsall chord
【24h】

Plans submitted for Ordsall chord

机译:为Ordsall和弦提交的计划

获取原文
获取原文并翻译 | 示例
           

摘要

Network Rail has submitted an application to build the Ordsall Chord, a new link connecting Manchester's Piccadilly and Victoria stations. The plans will ease a rail bottleneck to the south of Piccadilly station and enable more trains to travel through central Manchester. O n completion in late 2016/early 2017, it will provide: 1. Two new fast trains per hour between Manchester Victoria and Liverpool 2. Six fast trains, instead of four, per hour between Leeds and Manchester 3. Faster journeys between Manchester, Leeds and Liverpool 4. A new direct service through Manchester city centre to Manchester Airport 5. Faster journey times to Hull, Newcastle and the North East.
机译:Network Rail已提交了构建Ordsall Chord的申请,Ordsall Chord是连接曼彻斯特Piccadilly和Victoria车站的新链接。该计划将缓解皮卡迪利车站以南的铁路瓶颈,并使更多的火车穿越曼彻斯特市中心。该项目将于2016年底/ 2017年初竣工,将提供:1.曼彻斯特维多利亚和利物浦之间每小时两列新的快速列车2.利兹和曼彻斯特之间每小时六列快速列车,而不是四列3.曼彻斯特之间的快速旅行,利兹和利物浦4. through通过曼彻斯特市中心直达曼彻斯特机场的新直航服务。5.到达赫尔,纽卡斯尔和东北的更快旅程。

著录项

  • 来源
    《The Railway Magazine》 |2013年第1351期|10-10|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号