首页> 外文期刊>The Railway Magazine >£5m upgrade underway at Llandudno
【24h】

£5m upgrade underway at Llandudno

机译:兰迪德诺正在进行500万英镑的升级

获取原文
获取原文并翻译 | 示例
       

摘要

Work to enhance and upgrade Llandudno station is in full swing. A total of £5.1 million has been budgeted for the work, of which £3.5m has come from the Welsh Government, and £1.5m from the DfT's National Stations Improvement Programme. The Railway Heritage Trust is also contributing £150,000. With detailed design work underway, the station will get a new frontage more in keeping with the town's Victorian architecture, a new ticket office, improved customer information systems, upgraded toilets and improved bus interchange facilities.
机译:改善和升级兰迪德诺车站的工作正在紧锣密鼓地进行。这项工程的总预算为510万英镑,其中350万英镑来自威尔士政府,150万英镑来自DfT的国家电视台改善计划。铁路遗产基金会也捐款15万英镑。随着详细设计工作的进行,该车站将获得更多新面貌,与该镇的维多利亚式建筑保持一致,新的售票处,改善的客户信息系统,升级的洗手间和改善的公交换乘设施。

著录项

  • 来源
    《The Railway Magazine》 |2013年第1342期|79-79|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号