首页> 外文期刊>The Railway Magazine >NET GAINS IN NOTTINGHAM
【24h】

NET GAINS IN NOTTINGHAM

机译:诺丁汉的净收益

获取原文
获取原文并翻译 | 示例
           

摘要

Nottingham opened two new tram lines on August 25 - and surprised everyone by doing so at less than 24 hours notice. Phase two of the Nottingham Express Transit scheme has allowed the network to expand in two directions - south to a new terminus at Clifton, and in a westerly direction through Beeston, terminating at Toton Lane, Sandiacre. As part of a £570million project, the original city centre terminus at Station Street has closed and a new tram station has opened on the new bowstring bridge that spans Nottingham Midland station, offering step-free access to the station and street level. The extensions go their different ways just south of the railway station on the edge of the Meadows area. The Clifton line is 4.7 miles long, and crosses the River Trent using the former Wilford toll bridge, now strengthened and widened, with two tram lines as well as a route for cyclists and pedestrians. From Coronation Avenue to just under the A52 Clifton Boulevard, the tram line uses part of the former Great Central Railway alignment before turning right towards Clifton. It then runs along Southchurch Drive and Farnborough Road before terminating at Clifton South. Here, a free 1,100-space car park has been built next to the recently dualled A453. On the Clifton section are 12 tram stops, so the potential exists for some four million journeys a year. Journey time from the park & ride site to the main railway station is 21 minutes, or 24min to the Old Market Square, with a frequency of 7-10min from 07.00 to 21.00. The new second line extends 6.1 miles and after the split runs alongside Queen's Drive it then makes a right turn to cross the Midland Main Line for a second time, using a new bridge near Lenton South Junction, and on to a stop at the Queens Medical Centre, probably one of the main destinations for this line, clearly aimed at staff, patients and visitors; it provides the potential to reduce traffic in this frenetic area of the city.
机译:诺丁汉于8月25日开通了两条新的有轨电车线路,并在不到24小时的时间内使所有人感到惊讶。诺丁汉快速公交计划的第二阶段使网络可以向两个方向扩展-向南延伸至克利夫顿的新终点站,并通过西风方向通过Beeston,终止于Sandiacre的Toton Lane。作为一项耗资5.7亿英镑的项目的一部分,车站街原先的市中心总站已关闭,横跨诺丁汉米德兰车站的新弓弦桥上已开放了新的电车站,可无级通达车站和街道。延伸路线以不同的方式在草甸区边缘的火车站以南。克利夫顿线长4.7英里,使用以前的威尔福德收费桥穿越特伦特河,现已加固和拓宽,有两条电车线以及一条供骑自行车的人和行人使用的路线。从加冕大道到克利夫顿大道A52的正下方,电车线使用前大中央铁路路线的一部分,然后右转到克利夫顿。然后沿着Southchurch Drive和Farnborough Road行驶,然后在Clifton South终止。在这里,在最近翻倍的A453旁边建立了一个免费的1100个车位的停车场。在克利夫顿区有12个电车站,因此每年可能有约400万次旅行。从公园和乘车地点到火车总站的行程时间为21分钟,或者到旧市场广场为24分钟,从7.00到21.00的频率为7-10分钟。新的第二条线延伸6.1英里,在分岔道沿皇后大道(Queen's Drive)行驶后,再右转,第二次穿越米德兰干线,使用Lenton South Junction附近的新桥,然后在皇后区医疗站停下中心,可能是该线路的主要目的地之一,显然是针对工作人员,患者和访客的;它提供了减少该城市热闹地区交通的潜力。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号