首页> 外文期刊>The Railway Magazine >A NEW LOCO AT THE VALE OF RHEIDOL
【24h】

A NEW LOCO AT THE VALE OF RHEIDOL

机译:RHEIDOL的新机车

获取原文
获取原文并翻译 | 示例
           

摘要

It has been a long and weaving journey that has included two sea crossings, but 65 years after a Welsh quarry driver threw his coat over a jet of steam shooting from the boiler of Hunslet 0-4-0ST Margaret, the former Penrhyn loco will be back in action this autumn, making its public debut at the Vale of Rheidol Railway's September 26-27 steam festival. Margaret has not worked since that day in 1950 when the right-hand corner of its boiler backhead began leaking alarmingly while it was working in Penrhyn quarry. It is understood that after throwing his coat over the high-pressure leak, the driver rapidly drove back to the shed before throwing out the fire!
机译:这是一段漫长而又编织的旅程,其中包括两次海上穿越,但是在威尔士采石场的一名司机将外套涂在从洪斯莱特(Hunslet)0-4-0ST玛格丽特(Margaret)锅炉射出的一股蒸汽射流之后的65年之后,于今年秋天重返行动,并在9月26日至27日的莱茵河铁路蒸汽节上首次公开亮相。自1950年那一天起,玛格丽特(Margaret)一直没有工作,当时它在彭亨(Perrhyn)采石场工作时,锅炉尾端的右角开始令人震惊地泄漏。据了解,在将外套扔掉高压泄漏后,驾驶员迅速开车回到棚屋,然后扑灭了大火!

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号