首页> 外文期刊>The Railway Magazine >£46m upgrade plan: Castlerock semaphores signal final train
【24h】

£46m upgrade plan: Castlerock semaphores signal final train

机译:4600万英镑的升级计划:Castlerock信号灯指示最终列车

获取原文
获取原文并翻译 | 示例
       

摘要

NOVEMBER 2 marked the end of an era for Northern Ireland Railways (NIR) when at 21.00 the signal cabins at Derry/ Londonderry and Castlerock were switched out for the last time. The switch off is part of a £46million signalling upgrade, with the line in future being controlled from a new signalling centre within the station building at Coleraine. The centre was due to come on line in November 2016 following an 18-day closure of the line between Coleraine and Derry/Londonderry.
机译:11月2日标志着北爱尔兰铁路(NIR)时代的结束,当时Derry / Londonderry和Castlerock的信号室最后一次关闭是在21.00。关闭是信号灯升级中的4,600万英镑的一部分,将来该线路将由Coleraine车站大楼内的新信号中心进行控制。该中心原定于Coleraine与Derry / Londonderry之间的线路关闭18天后于2016年11月上线。

著录项

  • 来源
    《The Railway Magazine》 |2016年第1389期|72-72|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 01:26:21

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号