首页> 外文期刊>The Railway Magazine >Extra 'Scotsman' spend makes it the £7.2m locomotive
【24h】

Extra 'Scotsman' spend makes it the £7.2m locomotive

机译:额外的“苏格兰人”花费使它成为价值720万英镑的机车

获取原文
获取原文并翻译 | 示例
       

摘要

The National Railway Museum has revealed that the final cost of Flying Scotsman's trou blesome, 10-year long overhaul is £4.5million. The previously quoted figure was £300,000 lower, which was based on the overhaul spend up to summer 2015, with the loco still in an incomplete state. A combination of more work than originally anticipated and an intensified workload in order to hit the revised February deadline added significantly to the already unprecedented cost.
机译:国家铁路博物馆透露,飞行苏格兰人艰难的,为期10年的大修的最终费用为450万英镑。之前引用的数字降低了300,000英镑,这是基于截至2015年夏季的大修支出而机车仍处于不完整状态。为了达到2月修订的截止日期,工作量超出了最初的预期,工作量增加了,这大大增加了原本空前的成本。

著录项

  • 来源
    《The Railway Magazine》 |2016年第1387期|11-11|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 01:26:20

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号