【24h】

Completing the Set

机译:完成集合

获取原文
获取原文并翻译 | 示例
       

摘要

THE imminent launch of No. 2999 Lady of Legend - the 77th member of the 'Saint' class 4-6-0 - is expected in early 2018, and with excellent progress being made with the 81st member of the 'Grange' class 4-6-0 -No. 6880 Betton Grange (expected to steam in 2018/2019) - there remains just one more locomotive to be completed in order to see a complete set of Great Western design 4-6-0s for the first time since 1964. To reach this remarkable goal the Great Western Society (GWS) needs the help of Railway Magazine readers to complete No. 1014 County of Glamorgan, which is entering the final stage of its rebuild from 'Modified Hall' No. 7927 Willington Hull at the Didcot Railway Centre.
机译:预计将于2018年初发射2999号传奇女士-“圣”级4-6-0的第77名成员-并在“农庄” 4级的第81名成员中取得出色的进步6-0-不。 6880 Betton Grange(预计在2018/2019年投入使用)-仅剩下一部机车要完成,这是自1964年以来首次看到全套的Great Western设计4-6-0s。要达到这个非凡的目标大西部社会(GWS)需要铁路杂志读者的帮助才能完成1014号格拉摩根县的建设,而该县正从戴德科特铁路中心的7927年威灵顿·赫尔的“改装大厅”进入重建的最后阶段。

著录项

  • 来源
    《The Railway Magazine》 |2017年第1400期|36-38|共3页
  • 作者

    David Bradshaw;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 01:25:27

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号