首页> 外文期刊>The Railway Magazine >HS2: Concerns begin to mount over construction
【24h】

HS2: Concerns begin to mount over construction

机译:HS2:人们开始担心施工问题

获取原文
获取原文并翻译 | 示例
       

摘要

RUMOURS relating to HS2 design changes and infighting continue, as well as concerns by contractors about the high costs of designing and tendering for Phase 1 of the project. At Euston, the scheme approved by Parliament is proving to be a problem in that designing a grade separation just north of the station will not cause the collapse of a massive retaining wall holding up the Grade 1 houses on Park Village East when they start working on the as-yet unknown 100-year-old foundation.
机译:有关HS2设计变更和内斗的谣言仍在继续,以及承包商对项目第一阶段的设计和招标成本高昂的担忧。在尤斯顿(Euston),议会批准的计划被证明是一个问题,因为在车站北侧设计坡度隔离设施时,当他们开始在公园村东工作时,不会造成支撑住东公园村1级房屋的巨大挡土墙的倒塌。至今未知的100年历史的基金会。

著录项

  • 来源
    《The Railway Magazine》 |2017年第1400期|12-12|共1页
  • 作者

    Lord Berkeley;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 01:25:27

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号