首页> 外文期刊>The Railway Magazine >Crossrail stations taking shape
【24h】

Crossrail stations taking shape

机译:交叉铁路站初具规模

获取原文
获取原文并翻译 | 示例
       

摘要

THERE is less than two years to go before the £14.8billion cross-London railway opens and Crossrail has released aerial images of how its central London stations are progressing. At many of the 10 new stations across the capital architectural finishes are beginning to be installed. In the tunnels, more than 75% of the permanent track has been laid and the installation of other railway systems is underway. Simon Wright, Crossrail programme director, said: "These images highlight the extent of Crossrail's progress. The new stations are now taking shape with their ticket halls that will serve hundreds of thousands of passengers every single day. "Below ground, as the fit-out of the stations continues, it's now possible to get a real sense of how they will look and feel when they open at the end of the 2018."
机译:距离伦敦火车总值148亿英镑的铁路开通还不到两年的时间,Crossrail发布了有关其伦敦中央车站进展情况的航空影像。在首都的10个新车站中,有许多已开始安装建筑饰面。在隧道中,已经铺设了超过75%的永久性轨道,并且正在安装其他铁路系统。 Crossrail项目总监Simon Wright表示:“这些图像突显了Crossrail的进展程度。新车站的票房正在形成,每天将为成千上万的乘客提供服务。”在车站之外,现在可以真正了解它们在2018年底开放时的外观和感觉。”

著录项

  • 来源
    《The Railway Magazine》 |2017年第1392期|94-94|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 01:25:07

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号