...
首页> 外文期刊>The Railway Magazine >Cracks in Hitachi IET sets lead to mass cancellations
【24h】

Cracks in Hitachi IET sets lead to mass cancellations

机译:Hitachi IET裂缝套装导致大众取消

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

TWO major long distance operators, GWR and LNER, were thrown into chaos in the early hours of Saturday, May 8, as they were instructed to stop all movements of their Class 800, 801 and 802 units with immediate effect after the discovery of cracks during maintenance. What became a fast developing situation began shortly after 04.00 and actions included urgent messages to signallers and station staff "not to depart" services being worked by Hitachi units.
机译:两个主要的长距离运营商GWR和LET,于5月8日星期六的凌晨被抛入混乱,因为他们被指示在发现裂缝后立即效果停止其800,801和802个单位的所有运动 维护。 在04.00之后不久开始发生快速发展的情况,并采取行动包括发证人和车站工作人员的紧急信息“不离开”服务由Hitachi单位工作。

著录项

  • 来源
    《The Railway Magazine》 |2021年第1443期|8-9|共2页
  • 作者

    Tony Miles;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号