【24h】

Industrial Steam

机译:工业蒸汽

获取原文
获取原文并翻译 | 示例
       

摘要

THE Lakeside & Haverthwaite Railway's Andrew Barclay 0-4-0ST David (2333/1953) returned to operational service on April 2, more than five years since it last ran on the former Furness Railway branch. The ex-Millom Ironworks No. 1, which last ran in December 2013, is an ideal locomotive for the L&HR's off-peak services, and with a tractive effort of almost 20,000lbs can stroll away with all but the heaviest trains on the climb out of Haverthwaite. It is also useful as a station pilot at busier times, and will be called upon to work the line's popular double-headed 'Santa Specials'. The overhaul has been largely completed at Haverthwaite, with the boiler being sent to away for repairs to the outer firebox wrapper.
机译:湖滨&Haverthwaite铁路的安德鲁·巴克莱(Andrew Barclay)0-4-0ST戴维(2333/1953)于4月2日重新投入运营,距上一次在前Furness铁路分公司运行已有五年多。前米洛姆铁厂1号于2013年12月运行,是L&HR非高峰期服务的理想机车,经过约20,000磅的牵引力,除了最重的火车外,其他所有火车都可以漫步哈弗斯韦特的。在繁忙的时候,它也可以作为车站飞行员使用,并且将被要求使用该路线受欢迎的双头“ Santa Specials”。检修工作已在Haverthwaite大致完成,锅炉已送去维修外部火箱包装纸。

著录项

  • 来源
    《The Railway Magazine》 |2019年第1418期|76-76|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 04:23:18

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号