首页> 外文期刊>The Naval Architect >First FREMM frigate undertakes harbour acceptance tests
【24h】

First FREMM frigate undertakes harbour acceptance tests

机译:第一艘FREMM护卫舰进行港口验收测试

获取原文
获取原文并翻译 | 示例
       

摘要

In accordance with the programme schedule, DCNS recently completed equipment integration and harbour acceptance tests on board the first-of-cLass FREMM multi-mission frigate Aquitaine. At the time of writing, 95% of the electrical and hydraulic equipment on the ship had been installed, and the company was preparing for harbour acceptance tests of the principal systems: the information and communication system, the navigation systems (navigation radar, early warning radar), the electric power and distribution system (including four diesel generators), the combat system and the propulsion system.
机译:根据计划时间表,DCNS最近在首批FREMM多任务护卫舰阿基坦上完成了设备集成和港口验收测试。在撰写本文时,船上已安装了95%的电气和液压设备,该公司正在准备对主要系统进行港口验收测试:信息和通信系统,导航系统(导航雷达,预警系统)雷达),电力和配电系统(包括四台柴油发电机),战斗系统和推进系统。

著录项

  • 来源
    《The Naval Architect》 |2011年第1期|p.28|共1页
  • 作者

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号