首页> 外文期刊>The Motor ship >Gibdock continues offshore support ship dockings
【24h】

Gibdock continues offshore support ship dockings

机译:Gibdock继续进行海上支援舰对接

获取原文
获取原文并翻译 | 示例
           

摘要

One such job, for a returning customer, CGG of France, was a 21-day programme on high-capacity 3D seismic ship Viking Vanquish. The scope of work included a tailshaft withdrawal and the full overhaul of the shaft, couplings, liners and related equipment. This complex process required cutting away a section of the stern tube to gain access. Gibdock also carried out a series of load tests on the Viking Vanquish's winches and eye-plates, as well as a range of other machinery and pipe works. The yard renewed propeller blade seals and blasted and painted the vessel's exterior.
机译:对于回头客法国CGG来说,一项这样的工作是为期21天的大容量3D地震船Viking Vanquish计划。工作范围包括尾轴缩回以及轴,联轴器,衬套和相关设备的全面检修。这个复杂的过程需要切除船尾管的一部分才能进入。 Gibdock还对Viking Vanquish的绞盘和眼板以及一系列其他机械和管道工程进行了一系列载荷测试。船坞更新了螺旋桨叶片的密封件,并对船壳进行了喷砂和喷漆处理。

著录项

  • 来源
    《The Motor ship》 |2013年第11期|34-34|共1页
  • 作者

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号