首页> 外文期刊>Military engineer >LARGE-SCALE MODELING
【24h】

LARGE-SCALE MODELING

机译:大规模建模

获取原文
获取原文并翻译 | 示例
           

摘要

Aging energy infrastructure has made it increasingly difficult for naval installations to be adequately prepared to meet their missions. In March 2020, the U.S. Navy set an accelerated course for resilience by implementing a new energy strategy, the Installation Energy Resilience Strategy (IERS), which is focused on the delivery of uninterrupted, reliable, and high-quality power necessary to meet the evolving mission requirements outlined in the National Defense Strategy.Within IERS, the Navy stated the need to optimize the use of every available authority to accelerate thedelivery of secure and reliable energy- and importantly, have assured energy whenever or wherever it is required. The new strategy also adopted a resilience policy set to enable key military bases to go off-grid for at least two weeks by late 2025. This effort ensures installations are independent of public utilities.
机译:衰老能源基础设施使海军设施越来越困难,以充分准备满足其任务。 2020年3月,美国海军通过实施新的能源战略,安装能源弹性策略(IERS)设定了加速课程,该课程是集中于交付不间断,可靠和高质量的能力来满足不断发展的高质量 国防战略中概述的任务要求。 在IERS内,海军表示需要优化使用每个可用权限来加速 提供安全可靠的能源和重要的,每当需要或无论何处都能放心。 新策略还采用了一项恢复力政策,以便在2025年后延迟启用关键军事基地至少两周的电网。这项努力确保安装与公用事业无关。

著录项

  • 来源
    《Military engineer》 |2021年第733期|4244|共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号