Parametric Costing

机译:参数成本核算

获取原文
获取原文并翻译 | 示例
           

摘要

The use of parametric costing on a recent government proposal saved 1,000 hours and helped to promote the use of less expensive design alternatives. In the past, our company has used the bottoms-up and similar-to basis of estimate (BOE) approaches to determine program development costs. On a recent project, in response to the government's "cost as independent variable" (CAVV) initiative, our firm tried the parametric costing approach in conjunction with the BOE approach. A commercial knowl-edge base consisting of extensive industry data was used to estimate the development and production cost of a new sys-tem. The use of the knowledge base saved a considerable amount of research time and guesswork on the part of the cost engineer and made it possible to evaluate alternative approaches on a much timelier basis. The conclusion of the development team was that the parametric costing approach provides a useful alternative to the bottoms-up and BOE approaches that could offer significant benefits in many future programs.
机译:在最近的政府提案中,使用参数化成本节省了1,000个小时,并有助于促进使用更便宜的设计替代方案。过去,我们公司使用自下而上和近似估算(BOE)方法来确定程序开发成本。在最近的一个项目中,为了响应政府的“成本作为独立变量”(CAVV)计划,我们公司尝试了将参数成本法与BOE方法结合使用。一个由广泛的行业数据组成的商业知识基础被用来估算新系统的开发和生产成本。知识库的使用为成本工程师节省了大量的研究时间和猜测工作,并使得可以在更及时的基础上评估替代方法。开发团队的结论是,参数成本核算方法为自下而上和BOE方法提供了一种有用的替代方法,该方法可以在许多将来的计划中提供巨大的收益。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号