首页> 外文期刊>The Military Engineer >Greenup Dam and Bridge
【24h】

Greenup Dam and Bridge

机译:格林纳普水坝和桥梁

获取原文
获取原文并翻译 | 示例
           

摘要

Editor's Note: The following article "Greenup Dam and Bridge: A Masterpiece of Agency Co-Operation" was written by Joseph R. Turner, RE., and William F. Hawley, P.E., both of USACE Huntington District, and first published in the May-June 1986 issue of The Military Engineer. The authors detail how the U.S. Army Corps of Engineers, Federal Highway Administration, Commonwealth of Kentucky and State of Ohio in the mid-1980s worked together and with industry partners to design, fund and construct a two-lane highway bridge across the Ohio River using the existing Greenup Dam as a support structure for the road. As the nation today faces the considerable challenge of bringing our infrastructure to a safe and reliable level (an estimated $3.6 trillion investment is needed by 2020 alone), this highway across the Ohio is a sound example that success only will be possible through the collective efforts and shared responsibility of all United States governments-federal, state and local-as well as business and citizens alike.
机译:编者注:以下文章“绿化大坝和桥梁:代理合作的杰作”由REACE的Joseph R. Turner和PE的William F. Hawley撰写,均由USACE亨廷顿地区分校,并首次发表于1986年5月至6月发行的《军事工程师》。作者详细介绍了1980年代中期美国陆军工程兵团,联邦公路管理局,肯塔基州联邦政府和俄亥俄州的情况,以及如何与行业合作伙伴一起设计,资助和建造横跨俄亥俄河的两车道公路桥梁。现有的Greenup大坝作为道路的支撑结构。当今国家面临着将我们的基础设施提升到安全可靠水平的巨大挑战(仅到2020年,估计就需要投资3.6万亿美元),这条穿越俄亥俄州的高速公路就是一个很好的例子,只有通过集体努力才能取得成功并承担所有美国政府(联邦,州和地方政府)以及企业和公民的共同责任。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号