...
首页> 外文期刊>The Log >HEATHROW AND HS2
【24h】

HEATHROW AND HS2

机译:希思罗与HS2

获取原文
获取原文并翻译 | 示例

摘要

In 1991, the Government abandoned the route drawn up by British Rail for the country's first high speed line, the Channel Tunnel Rail Link (now HS1), and instead supported the alternative proposal developed by my team at Arup. The reason for that reversal? Because our proposal connected far more effectively with existing transport infrastructure, limited the environmental impacts of the railway by following existing transport corridors and tunnelling through sensitive rural and urban areas, adopted an appropriate design speed (300kph) to allow flexibility in alignment and offered vast regeneration benefits to east London.
机译:1991年,政府放弃了英国铁路公司为该国的第一条高速铁路海峡隧道铁路连接线(现在称为HS1)绘制的路线,而是支持我在奥雅纳公司团队开发的替代建议。逆转的原因?因为我们的建议将与现有运输基础设施的连接更加有效,通过遵循现有的运输走廊和穿越敏感的农村和城市地区的隧道来限制铁路对环境的影响,采用了适当的设计速度(300kph),可以灵活地调整路线并提供大量再生资源东伦敦的好处。

著录项

  • 来源
    《The Log 》 |2013年第spring期| 15-16| 共2页
  • 作者

    Mark Bostock;

  • 作者单位

    Heathrow Hub Ltd.;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号