首页> 外文期刊>The engineers journal >Road designers follow in great engineering tradition
【24h】

Road designers follow in great engineering tradition

机译:道路设计师遵循伟大的工程传统

获取原文
获取原文并翻译 | 示例
       

摘要

Roughan & O'Donovan Consulting Engineers were heavily involved from the outset of both the N9 Carlow Bypass and the N6 Kinnegad to Athlone projects. In 2000 Roughan & O'Donovan and alliance partner Faber Maunsell (ROD-FM), led by ROD Managing Director Garry Smyth, were appointed on the N9 scheme by Kildare County Council. They took the scheme through route selection, preliminary design, EIS and CPO leading to a successful outcome at oral hearing. On completion of the statutory process, ROD-FM prepared the tender documentation, administered the tendering process and undertook the role of the engineer within the construction contract. Roughan & O'Donovan's involvement on the N6 scheme, headed by Director Seamus MacGearailt, was under the RIADA Consult banner up to the completion of the oral hearing. At the construction phase, ROD, in joint venture with Ryan Hanley WSP, prepared the tender documentation and through ROD Director Harry Meighan administered the contract on behalf of Westmeath County Council.
机译:从N9卡洛旁路和N6 Kinnegad到Athlone项目的一开始,Roughan&O'Donovanova咨询工程师就参与其中。在2000年,Roughan&O'Donovan及其联盟合伙人Faber Maunsell(ROD-FM)由ROD董事总经理Garry Smyth领导,被基尔代尔县议会任命为N9计划的成员。他们通过路线选择,初步设计,EIS和CPO采纳了该计划,从而在口头听证会上取得了成功。法定程序完成后,ROD-FM准备了招标文件,管理了招标过程,并在建筑合同中担任了工程师的角色。 Roughan&O'Donovanova在导演Seamus MacGearailt的领导下参与了N6计划,直到完成口头听证会为止,它一直处于RIADA Consult的旗帜下。在施工阶段,ROD与Ryan Hanley WSP合资成立了招标文件,并通过ROD主任Harry Meighan代表Westmeath县议会管理了合同。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号