首页> 外文期刊>The energy daily >GE-Hitachi Claims Progress In New Reactor Licensing
【24h】

GE-Hitachi Claims Progress In New Reactor Licensing

机译:GE-Hitachi声称在新反应堆许可方面取得进展

获取原文
获取原文并翻译 | 示例
       

摘要

GE-Hitachi Nuclear Energy claimed a "key milestone" Wednesday in the development of its new Economic Simplified Boiling Water Reactor, saying it has answered reams of technical questions and successfully updated its application with the Nuclear Regulatory Commission to have the reactor licensed for use in the United States.rnGE-Hitachi submitted the so-called ESBWR design to NRC for certification in 2005. Since then, however, the agency'srnschedule for reviewing the reactor has slipped because NRC staff has posed more than 6,000 technical questions to GE about the ESBWR design.rnThe situation reached a low point in 2007 when then-chairman of the NRC Dale Klein told the Wall Street Journal that he wanted GE to "get its act together" in responding to NRC staff's questions and helping advance the ESBWR review.rnKlein and NRC staff have since said that GE has made more timely responses.
机译:GE-日立核能公司在其新的经济简化沸水反应堆的开发过程中称其为“关键里程碑”,该公司已回答了许多技术问题,并成功向核监管委员会更新了其应用,以使该反应堆获得许可用于GE-Hitachi于2005年向NRC提交了所谓的ESBWR设计以进行认证。然而,此后,该机构对反应堆进行审查的时间表有所减少,因为NRC员工已向GE提出了6,000多个有关该反应堆的技术问题。 2007年,当时的NRC主席Dale Klein告诉《华尔街日报》,他希望通用电气“团结一致”以回应NRC员工的问题并帮助推进ESBWR审查,这种情况达到了最低点。此后,NRC的工作人员表示,GE做出了更及时的回应。

著录项

  • 来源
    《The energy daily》 |2009年第171期|2-2|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 01:45:35

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号