...
首页> 外文期刊>The energy daily >First Solar To Supply SCE With 550 MW Of Photovoltaic Solar
【24h】

First Solar To Supply SCE With 550 MW Of Photovoltaic Solar

机译:第一家向SCE供应550 MW光伏太阳能的太阳能

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Unveiling plans for the second-largest solar photovoltaic plant in the country, Southern California Edison and First Solar Inc. said Tuesday that they will work together to construct two of the solar plants-with the larger to produce 300 megawatts-in southern California.rnUnder the agreement, Arizona-based First Solar will design and build a 250-megawatt (MW) project near Desert Center, Calif, to be called Desert Sunlight, and a 300-MW plant in northeastern San Bernardino County, dubbed Stateline.rnSouthern California Edison (SCE) will buy the entire output of both plants under 20-year contracts, an SCE spokeswoman said. Neither First Solar nor SCE divulged any financial aspects of the deal in separate press releases Tuesday.
机译:该国第二大太阳能光伏电站的启动计划周二宣布,南加州爱迪生和第一太阳能公司将在南加州共同建设两家太阳能电站,其中较大的一家可生产300兆瓦。根据协议,总部位于亚利桑那州的第一太阳能公司将在加利福尼亚沙漠中心附近设计并建设一个250兆瓦的项目,该项目被称为“沙漠阳光”,并在圣贝纳迪诺县东北部的一个名为Stateline的300兆瓦工厂中。 SCE发言人说,SCE将根据20年合同购买这两家工厂的全部产量。周二,First Solar和SCE均未透露交易的任何财务方面。

著录项

  • 来源
    《The energy daily》 |2009年第156期|13|共2页
  • 作者

    JEFF BEATTIE;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号