首页> 外文期刊>Sustainable Water Resources Management >Water from abandoned mines as a heat source: practical experiences of open- and closed-loop strategies, United Kingdom
【24h】

Water from abandoned mines as a heat source: practical experiences of open- and closed-loop strategies, United Kingdom

机译:来自废弃矿山的水作为热源:开环和闭环战略的实践经验,英国

获取原文
获取原文并翻译 | 示例
           

摘要

Pilot heat pump systems have been installed at two former collieries in Yorkshire/Derbyshire, England, to extract heat from mine water. The installations represent three fundamental configurations of heat exchanger. At Caphouse Colliery, mine water is pumped through a heat exchanger coupled to a heat pump and then discharged to waste (an open-loop heat exchange system). The system performs with high thermal efficiency, but the drawbacks are: (1) it can only be operated when mine water is being actively pumped from the colliery shaft for the purposes of regional water-level management, and (2) the fact that the water is partially oxygenated means that iron oxyhydroxide precipitation occurs, necessitating regular removal of filters for cleaning. At Markham Colliery, near Bolsover, a small amount of mine water is pumped from depth in a flooded shaft, circulated through a heat exchanger coupled to a heat pump and then returned to the same mine shaft at a slightly different depth (a standing column arrangement). This system's fundamental thermal efficiency is negatively impacted by the electrical power required to run the shaft submersible pump, but clogging issues are not significant. In the third system, at Caphouse, a heat exchanger is submerged in a mine water treatment pond (a closed-loop system). This can be run at any time, irrespective of mine pumping regime, and being a closed-loop system, is not susceptible to clogging issues.
机译:在英国约克郡/德比郡的两个前煤矿安装了先导热泵系统,以从矿井水中提取热量。装置代表了热交换器的三个基本配置。在Caphouse Colliery,矿井水被泵送通过与热泵相连的热交换器,然后排入废物(开环热交换系统)。该系统具有很高的热效率,但缺点是:(1)仅在出于区域水位管理的目的从矿井井筒积极抽出矿井水时才能运行;(2)水被部分氧化时,表示会发生羟基氧化铁沉淀,因此需要定期拆卸过滤器进行清洁。在Bolsover附近的Markham Colliery,少量矿井水从深井中抽入,通过与热泵相连的热交换器循环,然后以略有不同的深度返回同一矿井(立柱布置) )。该系统的基本热效率受到运行竖井潜水泵所需电力的负面影响,但堵塞问​​题并不严重。在Caphouse的第三个系统中,热交换器被浸没在矿井水处理池中(闭环系统)。它可以在任何时间运行,而与矿井的抽水方式无关,并且它是一个闭环系统,不易出现堵塞问题。

著录项

  • 来源
    《Sustainable Water Resources Management》 |2019年第1期|29-50|共22页
  • 作者单位

    School of Engineering, James Watt Building (South), University of Glasgow, Glasgow G12 8QQ, UK,Holymoor Consultancy Ltd., 360 Ashgate Road, Chesterfield, Derbyshire S40 4BW, UK;

    Innovative and Sustainable Built Environment Technologies Research Group (iSBET), Nottingham Trent University, Nottingham NG1 4BU, UK,Alkane Energy Plc, Edwinstowe House, Edwinstowe, Nottingham NG21 9PR, UK;

    Innovative and Sustainable Built Environment Technologies Research Group (iSBET), Nottingham Trent University, Nottingham NG1 4BU, UK;

    School of Engineering, James Watt Building (South), University of Glasgow, Glasgow G12 8QQ, UK;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

    Heat pump; Colliery; Mine water; Green energy; Thermogeology; Iron;

    机译:热泵;煤矿;矿井水;绿色能源;热地质学;铁;

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号