首页> 外文期刊>Studies in conservation >The restoration of the Stone Fountain in Kutna Hora: An assessment of the contemporary intervention within the context of repairs throughout history
【24h】

The restoration of the Stone Fountain in Kutna Hora: An assessment of the contemporary intervention within the context of repairs throughout history

机译:库特纳霍拉(Kutna Hora)石喷泉的修复:在整个历史修复过程中对当代干预的评估

获取原文
获取原文并翻译 | 示例
           

摘要

The Stone Fountain is situated in the historical centre of Kutna Hora, a UNESCO listed town, and one of the most important monuments in Bohemia. The fountain was constructed from 1493 to 1495 and was originally built of biodetritic limestone. During extensive reconstruction in the nineteenth century a substantial part of the ornamentation was replaced with fine-grained sandstone of inferior quality, resulting in a range of problems at a later date. During the twentieth century, the fountain underwent several repairs which failed to halt the process of degradation, and conversely had a negative effect on the condition of the monument. The last restoration intervention, undertaken from 2010 to 2011, resulted after a thorough examination of the monument documenting the damage and establishing the principal causes of the damage. The subsequent conservation, proposed on the basis of the aforementioned examination, revolved around the extensive cement repairs and acrylic coatings covering the surface, causing significant deterioration to the stone underneath. Furthermore, the deep salinity of the masonry and vast diversity of materials had to be addressed, alongside questions concerning the presentation of the architectonic work and options for its preventive conservation. This article includes a description of the adopted concept, applied processes, and an assessment of the interventions after a five-year interval.
机译:石泉位于库特纳霍拉(Kutna Hora)的历史中心,库特纳霍拉(Kutna Hora)被联合国教科文组织列为城镇,是波西米亚最重要的古迹之一。该喷泉建于1493年至1495年,最初是用生物破坏性石灰石建造的。在19世纪的大规模重建中,大部分装饰物被劣质的细粒砂岩所取代,后来又产生了一系列问题。在20世纪,喷泉进行了几次修复,未能阻止其退化,反而对纪念碑的状况产生了负面影响。最后一次干预措施是2010年至2011年进行的,是在对古迹进行了彻底检查之后记录的,并记录了造成破坏的主要原因。在上述检查的基础上,随后进行的养护工作围绕着广泛的水泥修补和覆盖表面的丙烯酸涂料进行,从而使下面的石材显着变质。此外,必须解决砌体的盐度高和材料种类繁多的问题,以及有关建筑作品的介绍及其预防性保护的选择的问题。本文介绍了采用的概念,应用的过程,以及每隔五年间隔后对干预措施的评估。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号