首页> 外文期刊>Structural Engineering and Mechanics >Pretension process control based on cable force observation values for prestressed space grid structures
【24h】

Pretension process control based on cable force observation values for prestressed space grid structures

机译:基于索力观测值的预应力空间网格结构预张过程控制

获取原文
获取原文并翻译 | 示例
           

摘要

Pointing to the design requirement of prestressed space grid structure being the target cable force, the pretension scheme decision analysis method is studied when there's great difference between structural actual state and the analytical model. Based on recursive formulation of cable forces, the simulative recursive system for pretension process is established from the systematic viewpoint, including four kinds of parameters, i.e., system initial value (structural initial state), system input value (tensioning control force scheme), system state parameters (influence matrix of cable forces), system output value (pretension accomplishment). The system controllability depends on the system state parameters. Based on cable force observation values, the influence matrix for system state parameters can be calculated, making the system controllable. Next, the pretension scheme decision method based on cable force observation values can be formed on the basis of iterative calculation for recursive system. In this way, the tensioning control force scheme that can meet the design requirement when next cyclic supplemental tension finished is obtained. Engineering example analysis results show that the proposed method in this paper can reduce a lot of cyclic tensioning work and meanwhile the design requirement can be met.
机译:针对预应力空间网格结构的设计要求是目标索力,当结构实际状态与解析模型存在较大差异时,研究了预应力方案决策分析方法。基于拉索力的递推公式,从系统的观点出发,建立了预拉力仿真递归系统,包括系统初始值(结构初始状态),系统输入值(张紧控制力方案),系统四种参数。状态参数(电缆力的影响矩阵),系统输出值(预应力完成)。系统的可控制性取决于系统状态参数。根据缆索力的观测值,可以计算出系统状态参数的影响矩阵,从而使系统可控。接下来,可以在递归系统的迭代计算的基础上,形成基于索力观测值的预应力方案决策方法。这样,获得了下一次循环补充张力完成时可以满足设计要求的张力控制力方案。工程实例分析结果表明,本文提出的方法可以减少大量的循环张紧工作,同时可以满足设计要求。

著录项

  • 来源
    《Structural Engineering and Mechanics》 |2010年第6期|p.739-753|共15页
  • 作者单位

    Key Laboratory of RC & PC of Ministry of Education, Southeast University, Nanjing 210096, PR China International Institute for Urban Systems Engineering, Southeast University, Nanjing 210096, PR China;

    Key Laboratory of RC & PC of Ministry of Education, Southeast University, Nanjing 210096, PR China International Institute for Urban Systems Engineering, Southeast University, Nanjing 210096, PR China;

    Key Laboratory of RC & PC of Ministry of Education, Southeast University, Nanjing 210096, PR China International Institute for Urban Systems Engineering, Southeast University, Nanjing 210096, PR China;

  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

    prestress; space grid structure; pretension process; cable force; recursive system;

    机译:预应力空间网格结构;预紧过程索力;递归系统;

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号