The replacement of a rail overbridge in Stratford, East London, UK was undertaken in preparation for the London 2012 Olympic and Paralympic Games. Improvements to the rail infrastructure to implement the transport strategy for the London 2012 Olympic and Paralympic Games necessitated the demolition and replacement of an existing highway bridge with substandard headroom over the railway. The task was made considerably more challenging by the presence of multiple site constraints; including tunnels for both high-speed and local rail services, a significant number of utilities, a drive to improve headroom and a critical deadline. Finding a deliverable solution in spite of these constraints required considerable engineering problem solving. The eventual solution resulted in some unusual retaining wall designs and relied on extensive use of lightweight fill, careful consideration of phasing for the works and close liaison with various stakeholders. This paper discusses the constraints on the bridge and associated retaining walls and how these were addressed. Consideration is given to the various issues and challenges involved in delivering a cost-effective solution. Construction of the bridge and its associated structures was completed in summer 2010.
机译:为伦敦2012年伦敦奥运会和残奥会做准备,更换了英国东伦敦斯特拉特福德的铁路天桥。为了实施2012年伦敦奥运会和残奥会的运输战略而对铁路基础设施进行了改进,因此有必要拆除和更换现有的公路桥梁,该公路桥梁的净空高度不合标准。由于存在多个站点限制,使这项任务更具挑战性。包括用于高速和本地铁路服务的隧道,大量公用事业,改善净空的驱动器和关键的截止日期。尽管存在这些限制,但要找到可交付的解决方案,仍需要解决大量的工程问题。最终的解决方案导致了一些不寻常的挡土墙设计,并依赖于轻质填料的广泛使用,对施工阶段的仔细考虑以及与各利益相关方的密切联系。本文讨论了桥梁和相关挡土墙上的约束以及如何解决这些约束。在提供具有成本效益的解决方案时会考虑各种问题和挑战。桥梁及其相关结构的施工已于2010年夏季完成。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号