...
首页> 外文期刊>Structural engineering international >Energy from Waste Facility at Lakeside, London, UK-An Economic and Sustainable Solution to Waste Management
【24h】

Energy from Waste Facility at Lakeside, London, UK-An Economic and Sustainable Solution to Waste Management

机译:英国伦敦湖畔废物处理厂的能源-废物管理的经济和可持续解决方案

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

The Lakeside Energy from Waste (EfW) plant is a state-of-the-art facility to convert household, commercial and industrial waste into electrical energy by utilising the heat energy generated from an incineration process to power a super-heated steam turbine. The plant is situated to the west of London, UK, and is incorporated into the existing waste handling strategies in the area. EfW facilities are subjected to very stringent planning processes and have always demanded a high level of architectural presence to satisfy these requirements. Therefore the process equipment is placed inside a large open-spaced steelwork framed shell. This requirement generated a number of structural design and construction challenges for the steelwork frame, including the provision of hybrid columns and large-span curved cellular roof beams. The EfW process requires a continual supply of waste material. In order to facilitate the required volume of material, it is necessary to form a bunker structure within the ground and to extend the walls to the elevated tipping hall floor. Construction of this deep bunker in poor ground conditions necessitated the use of secant piles and innovative slip-form techniques.
机译:湖边的废物能源(EfW)厂是利用焚化过程中产生的热能为过热蒸汽轮机提供动力的先进设施,可将家庭,商业和工业废物转化为电能。该工厂位于英国伦敦的西部,并已纳入该地区现有的废物处理策略。 EfW设施要经过非常严格的计划流程,并且始终要求高水平的架构才能满足这些要求。因此,该过程设备被放置在一个大型的,间隔开的钢制框架内。这项要求给钢结构框架带来了许多结构设计和施工挑战,包括提供混合柱和大跨度弯曲蜂窝状顶棚梁。 EfW过程需要持续供应废料。为了便于所需的材料量,必须在地面内形成一个掩体结构,并将墙壁延伸到高架的倾卸室地板。在恶劣的地面条件下建造这座深deep堡,必须使用割线桩和创新的滑模技术。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号