...
首页> 外文期刊>Space news >Gaia, 03b Launch Delays Prompted by Common Component lssue
【24h】

Gaia, 03b Launch Delays Prompted by Common Component lssue

机译:Gaia,03b发射延迟由通用组件lssue提示

获取原文
获取原文并翻译 | 示例
           

摘要

A defective digital timing unit that forced four commercial broadband satellites to be pulled from launch preparations in September has now had the same effect on the Gaia star-mapping satellite owned by the European Space Agency (ESA), European government and industry officials said. As was the case with the four satellites owned by startup operator O3b Networks, whose late-September launch aboard a Europeanized Soyuz rocket was scrubbed in the middle of the month, Gaia's planned Nov.
机译:欧洲政府和行业官员说,一个有缺陷的数字定时装置迫使九月份从发射准备工作中拉出了四颗商业宽带卫星,现在对欧洲航天局(ESA)拥有的盖亚恒星映射卫星具有相同的影响。与初创运营商O3b Networks拥有的四颗卫星一样,盖亚计划于11月中旬将其9月下旬在欧洲化的联盟号火箭上发射升空。

著录项

  • 来源
    《Space news》 |2013年第42期|5-5|共1页
  • 作者

    PETER B.de SELDING;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号