首页> 外文期刊>Space news >USA and ATK Resolve Ares 1 Launch Vehicle Work Dispute
【24h】

USA and ATK Resolve Ares 1 Launch Vehicle Work Dispute

机译:美国和ATK解决Ares 1运载火箭工作争议

获取原文
获取原文并翻译 | 示例
       

摘要

Minneapolis-based Alliant Techsystems (ATK) announced Oct. 16 it had resolved a contract dispute with United Space Alliance (USA) about the work the Houston-based space shuttle operator will perform in support of the Ares 1 crew launch vehicle NASA has under development. The two sides signed a memorandum of agreement three days earlier outlining some $250 million worth of work USA will perform through 2013 or 2014 as a subcontractor on ATK's Ares 1 main stage development efforts. ATK and USA officials said during an Oct. 16 teleconference with reporters that finalizing a formal contract would take an additional 30 to 60 days.
机译:位于明尼阿波利斯的Alliant Techsystems(ATK)于10月16日宣布,已解决与美国联合太空联盟(United Space Alliance)的合同纠纷,该纠纷涉及这家总部位于休斯顿的航天飞机运营商为支持NASA正在开发的Ares 1载人运载火箭而开展的工作。双方三天前签署了一项协议备忘录,概述了美国将作为ATK的Ares 1主阶段开发工作的分包商在2013或2014年进行的价值约2.5亿美元的工作。 ATK和美国官员在10月16日与记者举行的电话会议中表示,敲定正式合同将需要30至60天。

著录项

  • 来源
    《Space news》 |2008年第41期|p.10|共1页
  • 作者

    BRIAN BER6ER;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 航空、航天;
  • 关键词

  • 入库时间 2022-08-17 13:46:56

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号