...
首页> 外文期刊>Soil mechanics and foundation engineering >Experience in Designing Effective Zero Cycle Solutions
【24h】

Experience in Designing Effective Zero Cycle Solutions

机译:设计有效零周期解决方案的经验

获取原文
获取原文并翻译 | 示例

摘要

The experience gained in designing a construction pit for a three-story underground portion of a mixed-use complex is examined. Technical decisions making it possible to reduce significantly the cost of zero cycle work and the construction time are proposed. The results of calculations performed using two software systems of the pit enclosing structure as well as the results of their comparison with geotechnical monitoring data are presented.
机译:考察了为综合用途综合体的三层地下部分设计施工坑所获得的经验。提出了可以大大降低零周期工作成本和建造时间的技术决策。介绍了使用坑围结构的两个软件系统执行的计算结果,以及它们与岩土监测数据的比较结果。

著录项

  • 来源
    《Soil mechanics and foundation engineering 》 |2017年第4期| 258-263| 共6页
  • 作者单位

    Gersevanov Res Inst Bases & Underground Struct NI, Moscow, Russia;

    Gersevanov Res Inst Bases & Underground Struct NI, Moscow, Russia;

    Gersevanov Res Inst Bases & Underground Struct NI, Moscow, Russia;

    Gersevanov Res Inst Bases & Underground Struct NI, Moscow, Russia;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号