...
首页> 外文期刊>Soil mechanics and foundation engineering >Slipway Pile Footing Stiffness and Transient Launch Loads
【24h】

Slipway Pile Footing Stiffness and Transient Launch Loads

机译:滑台桩基刚度和瞬态发射载荷

获取原文
获取原文并翻译 | 示例

摘要

This paper presents information on the necessity of accounting for the effect of transient ship launch loads on inclined longitudinal slipway structures when evaluating the design stiffness of the pile footing. A considerable increase in the stiffness is registered in comparison with such structure's resistance under static loads conditions. The introduction of an additional factor of operating condition, to increase the design bearing capacity of piles under instantaneous loads is substantiated.
机译:本文介绍了在评估桩基础的设计刚度时,有必要考虑瞬态船舶发射载荷对倾斜的纵向滑道结构的影响的信息。与这种结构在静态载荷条件下的抵抗力相比,刚度明显增加。引入了额外的运行条件因素,以提高瞬时荷载下桩的设计承载力。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号