首页> 外文期刊>Soil mechanics and foundation engineering >ANALYSIS OF THE POSSIBLE CRACKING AND DAMAGES OF TUNNEL LINING SEGMENTS DURING INSTALLING STAGE
【24h】

ANALYSIS OF THE POSSIBLE CRACKING AND DAMAGES OF TUNNEL LINING SEGMENTS DURING INSTALLING STAGE

机译:分析安装阶段隧道衬片段的可能开裂和损伤

获取原文
获取原文并翻译 | 示例
       

摘要

Tunnel lining segments can crack or sustain fractures at different stages. It will then affect the stability and structure of the tunnel construction process. Segments are mainly loaded during the installation stage. The main objective of this research is to identify the main factors in the creation of cracks and chipping in segments during the installation stage. By analyzing the collected data, the causes of cracking are investigated such as excessive forces of the TBM jacks, joint dislocation (offset), spacing (gap) in the segmental ring, and defects of the support conditions. Using a statistical analysis of the field data, the interpretation of these causes is discussed. In addition, numerical results are presented to validate the effect of jacking forces on the segments.
机译:隧道衬里段可以在不同阶段破裂或维持骨折。 然后它将影响隧道施工过程的稳定性和结构。 在安装阶段主要装入段。 本研究的主要目的是确定安装阶段在段中创建裂缝和碎裂的主要因素。 通过分析收集的数据,研究了裂缝的原因,例如TBM插孔的过度力,节段环中的关节位错(偏移),间距(间隙),以及支撑条件的缺陷。 使用对现场数据的统计分析,讨论了对这些原因的解释。 此外,提出了数值结果以验证顶层力对段的效果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号