...
首页> 外文期刊>SNL Energy Coal Report >Alberta regulators approve west-of-Edmonton transmission projects, rebuilds
【24h】

Alberta regulators approve west-of-Edmonton transmission projects, rebuilds

机译:艾伯塔省监管机构批准埃德蒙顿西部的输电项目,并进行重建

获取原文
获取原文并翻译 | 示例

摘要

The Alberta Utilities Commission on Aug. 12 approved a group of ntransmission projects and upgrades in the west-of-Edmonton area.nRegulators combined five applications into one docket, approving ntwo related AltaLink LP projects and two EPCOR Distribution and nTransmission projects. The AUC also approved an amendment to nthe approval of need from the Alberta Electric System Operator for nthe Edmonton-region 240-kV line upgrades, correcting a mistake in nwhere one existing line will end.
机译:艾伯塔省公用事业委员会于8月12日批准了埃德蒙顿西部地区的一组n传输项目和升级。n监管机构将五份申请合并为一份文件,批准了n两个相关的AltaLink LP项目以及两个EPCOR Distribution and nTransmission项目。 AUC还批准了艾伯塔省电力系统运营商对埃德蒙顿地区240 kV线路升级的需求批准的修正案,纠正了现有线路终止的错误。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号