首页> 外文期刊>SNL Energy Coal Report >Transmission review concludes Alberta needs 2 ‘critical’ north-south lines
【24h】

Transmission review concludes Alberta needs 2 ‘critical’ north-south lines

机译:变速箱审查得出结论,艾伯塔省需要两条“关键”南北线

获取原文
获取原文并翻译 | 示例
           

摘要

Two 500-kV high-voltage, direct-current ntransmission lines between Alberta’s two larg-nest cities, considered “critical” by the provincial ngovernment but strongly criticized by consum-ners, have been endorsed by a review panel set nup to determine their reasonableness.
机译:阿尔伯塔省两个大巢城市之间的两条500 kV高压直流输电线路,被省政府认为是“关键”,但受到消费者的强烈批评,已经得到审核小组的认可,以确定其合理性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号