...
首页> 外文期刊>SNL Energy Coal Report >Fuel flexibility could prove valuable under PJM’s capacity performance system
【24h】

Fuel flexibility could prove valuable under PJM’s capacity performance system

机译:在PJM的容量绩效系统下,燃油灵活性可能会被证明很有价值

获取原文
获取原文并翻译 | 示例
           

摘要

PJM Interconnection LLC’s new capacity performance proposal —rnconditionally approved by FERC on June 9 — could benefit co-firedrnor fuel-switching power plants bidding into future PJM capacityrnauctions.rnPJM in December 2014 requested FERC approval on reformsrnto its capacity market, known as the reliability pricing model, orrnRPM, in response to problems the region experienced during thern“arctic blast” in early 2014. The intense cold period drove up energyrnconsumption in the region, ultimately leading power and natural gasrnprices to spike. During this time, PJM also experienced an increase ofrngenerator outages and fuel supply challenges.
机译:PJM Interconnection LLC的新容量性能建议书(在6月9日获得FERC的有条件批准)可能会有利于联合火控燃料转换发电厂竞标未来的PJM容量航线。rnPJM于2014年12月要求FERC批准对其容量市场进行改革,称为可靠性定价。该模型称为orrnRPM,以应对该地区在2014年初“北极爆炸”中遇到的问题。强烈的寒冷时期驱使该地区的能源消耗,最终导致电力和天然气价格飙升。在这段时间内,PJM还经历了发电机停机和燃料供应挑战的增加。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号