...
首页> 外文期刊>Smart and sustainable built environment >Use of LCA to evaluate solutions for water and waste infrastructure in the early planning phase of carbon-neutral urban settlements
【24h】

Use of LCA to evaluate solutions for water and waste infrastructure in the early planning phase of carbon-neutral urban settlements

机译:在碳中和城市居住区的早期规划阶段,使用LCA评估水和废物基础设施的解决方案

获取原文
获取原文并翻译 | 示例

摘要

Purpose - The paper aims to discuss how life cycle assessment can be used in the early stage planning phase of new settlements. Design/methodology/approach - By applying the life cycle methodology on the waste, water and wastewater system of a new carbon-neutral settlement under planning in Norway, the authors discuss the pros and cons with applying this methodology in an early planning phase. Findings - The LCA methodology enabled the authors to compare suggestions from interdisciplinary planning teams, relate them to the existing systems in Trondheim and provide quantitative results back to the decision-makers, in this case the municipality. The environmental benefits of implementing alternative solutions in the waste, water and wastewater systems were found to be small. Research limitations/implications - Data availability and uncertainty can be limitations in the early planning phase. Practical implications - By applying this methodology, the life cycle environmental impact of different solutions can be assessed at an early planning stage. Originality/value - Even if life cycle assessment has been used for years in the research community, there is too little experience with applying the methodology in the early planning phase of new projects. This paper discuss how life cycle assessment can be used to compare suggestions from interdisciplinary planning teams, relate them to existing systems and provide quantitative results back to the decision-makers.
机译:目的-本文旨在讨论如何在新定居点的早期规划阶段中使用生命周期评估。设计/方法/方法-通过将生命周期方法论应用于挪威正在计划中的新型碳中和定居点的废水,水和废水系统,作者讨论了在早期计划阶段应用这种方法的利弊。研究结果-LCA方法使作者能够比较跨学科计划团队的建议,将其与特隆赫姆的现有系统联系起来,并向决策者(在本例中为市政当局)提供定量结果。发现在废水,水和废水系统中实施替代解决方案的环境效益很小。研究局限性/含义-数据可用性和不确定性可能是早期计划阶段的局限性。实际意义-通过应用此方法,可以在早期计划阶段评估不同解决方案对生命周期的环境影响。原创性/价值-即使生命周期评估已在研究领域中使用了多年,但在新项目的早期计划阶段应用该方法的经验仍然很少。本文讨论了如何使用生命周期评估来比较跨学科计划团队的建议,将其与现有系统相关联,并将定量结果提供给决策者。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号