首页> 外文期刊>Signal + Draht >BLS relies on the geo-redundant control system Iltis N from Siemens Mobility
【24h】

BLS relies on the geo-redundant control system Iltis N from Siemens Mobility

机译:BLS依赖于来自西门子移动性的地理冗余控制系统ILTIS N

获取原文
获取原文并翻译 | 示例
           

摘要

1 General information on the Iltis N operations control system Controlguide Iltis N (hereinafter abbreviated to Iltis N) is a highly reliable and future-proof operations control system that covers the entire spectrum of operations control: from the local operation of interlockings, to the complete automation of nation-wide rail networks. The Iltis N operations control system allows operators of railway infrastructure to run their rail network efficiently and op-timally utilise its capacity. The system is highly scalable and can be tailored to meet the specific needs of railway operators both big and small.
机译:1关于ILTIS N操作控制系统ControlGuide ILTIS N(以下简称为ILTIS N)的一般信息是一种高度可靠和未来的操作控制系统,涵盖了整个操作控制器:从锁定轴的本地操作,到完整 全国范围内的自动化网络。 ILTIS N操作控制系统允许铁路基础设施的运营商有效运行其铁路网络,并运行其容量。 该系统具有高度可扩展的,可以根据大小和小的铁路运营商满足具体需求。

著录项

  • 来源
    《Signal + Draht》 |2021年第6期|60-64|共5页
  • 作者

    Barbara Kostner; Anne Lehnert;

  • 作者单位

    Siemens Mobility AG Hammerweg 1.CH-8304 Wallisellen;

    LS Netz AG Genfergasse 11 CH-3001 Bern;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号