首页> 外文期刊>Ships monthly >Porte-Avions' pit stop
【24h】

Porte-Avions' pit stop

机译:航空母舰进站

获取原文
获取原文并翻译 | 示例
           

摘要

After six operational deployments in as many years, the French aircraft carrier Charles de Gaulle has entered dry dock at Toulon for her first major overhaul. The nuclear-powered vessel will undergo refuelling and upgrade work to her flight deck and communications systems. Her troublesome propellers will be replaced with a new design courtesy of Rolls Royce USA. The new blades will allow the ship to reliably maintain her maximum speed of 27 knots, which is critical for the safe operation of catapult-launched aircraft. The change is all the more important with the heavier Rafale F3 aircraft and the new ASMP-A nuclear missile soon to enter service.
机译:经过多年的六次作战部署,法国航母戴高乐(Charles de Gaulle)进入土伦干船坞进行了首次大修。核动力船将进行加油并将其驾驶舱和通信系统升级。她麻烦的螺旋桨将由美国劳斯莱斯公司提供的新设计取代。新的叶片将使船舶可靠地保持其27节的最高速度,这对弹射发射飞机的安全运行至关重要。随着重装阵风F3飞机和新型ASMP-A核导弹即将投入使用,这一变化尤为重要。

著录项

  • 来源
    《Ships monthly》 |2007年第11期|11|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 水路运输;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号