首页> 外文期刊>Ships monthly >Clemenceau Off To Breakers
【24h】

Clemenceau Off To Breakers

机译:克莱门梭(Clemenceau)走向破碎

获取原文
获取原文并翻译 | 示例
       

摘要

Klyne Tugs (Lowestoft) Ltd has delivered the former French aircraft carrier Clemenceau to the Able UK TERRC (Teesside Environmental Reclamation and Recycling Centre) facility at Able Seaton Port on the river Tees to be broken up. The operation was a straightforward commercial towage operation undertaken by the anchor-handling tug Anglian Earl. Remarking on the safe arrival of the ship, Captain Colin Harrison, Able UK's, Head of Ports & Logistics said: 'We were delighted with the level of service provided by Klyne Tugs. This was a very high profile event and the commission was undertaken on schedule and with an essential overriding emphasis on safety. All parties involved deserve congratulating for a job well done.'
机译:Klyne Tugs(Lowestoft)Ltd已将前法国航空母舰Clemenceau交付给位于提斯河Able Seaton港口的Able UK TERRC(提斯赛德环境垦殖与再循环中心)设施,该工厂将被拆散。该操作是由锚点处理拖船Anglian Earl进行的直接商业拖船操作。 Able UK港口和物流主管Colin Harrison船长在谈到船舶安全抵达时说:“我们对Klyne Tugs所提供的服务水平感到满意。这是一个非常引人注目的事件,该委员会如期进行,并且最重要的是强调安全性。有关各方值得为这项工作做得很好而表示祝贺。”

著录项

  • 来源
    《Ships monthly》 |2009年第4期|2|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 01:45:05

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号