首页> 外文期刊>Ships monthly >Ferry Delay Slammed
【24h】

Ferry Delay Slammed

机译:轮渡延误

获取原文
获取原文并翻译 | 示例
           

摘要

Questions have been asked in Parliament why Wightlink has not been able to commission its two new vessels for the Lymington-Yarmouth service more than three months after they were delivered. MP Andrew Turner insists that the needs of low residents should be taken into account and has also asked harbour commissioners for any substantive reason why Wight Light and Wight Sky (below) should not be brought into service. Turner said: 'There is a perception by some in Lymington that the new ferries may cause difficulties for river users. However, it is time the harbour authorities gave proper reasons why they are holding up the introduction of the new ferries.'
机译:国会已经问了一些问题,为什么Wightlink在交付之后的三个多月内仍无法为Lymington-Yarmouth服务调试其两艘新船。国会议员安德鲁·特纳(Andrew Turner)坚持应考虑到低地居民的需求,并且出于任何实质性原因,还要求港口事务专员为何不启用“怀特轻轨”和“怀特蓝天”(下图)。特纳说:“在利明顿,有人认为新渡轮可能给河川使用者带来困难。然而,现在是时候港口当局给出了为什么他们拒绝引进新渡轮的适当理由了。”

著录项

  • 来源
    《Ships monthly》 |2009年第2期|p.6|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 水路运输;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号