首页> 外文期刊>Ships monthly >Severn Link plan for route
【24h】

Severn Link plan for route

机译:Severn Link路线图

获取原文
获取原文并翻译 | 示例
       

摘要

High-speed passenger craft could be running across Bristol Channel from around Easter 2010 in a new service linking Swansea and llfracombe. Severn Link, the brainchild of Chris Marrow, will have a passage time of 50 minutes compared to around four hours needed for the road journey from South Wales to North Devon. The 40m Flying Cats FastcatrnRyde and Fastcat Shanklm, recently displaced from wightlink's Portsmouth-Ryde, are being purchased and Severn Link say Swansea-llfracombe could be the first of a series of routes across the Bristol Channel.
机译:从2010年复活节前后开始,高速客运飞机将在布里斯托尔海峡运行,这是一项连接斯旺西和llfracombe的新服务。 Severn Link是Chris Marrow的创意,通过时间为50分钟,而从南威尔士到北德文郡的旅程大约需要四个小时。最近已从Wightlink的朴茨茅斯-莱德(Portsmouth-Ryde)迁离的4000万飞行猫FastcatrnRyde和Fastcat Shanklm正在购买,Severn Link说Swansea-llfracombe可能是穿越布里斯托尔海峡的一系列路线中的第一条。

著录项

  • 来源
    《Ships monthly》 |2010年第1期|9|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 01:44:45

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号