首页> 外文期刊>Ships monthly >Changed deployments
【24h】

Changed deployments

机译:变更的部署

获取原文
获取原文并翻译 | 示例
           

摘要

Already six months late in being delivered, AIDAprima (122,500gt), the first of two ships being built for Aida Cruises by Mitsubishi Heavy Industries in Japan, would be delayed by a further six months, it was announced in late July. As a result, the maiden voyage from Japan to Dubai has been cancelled, as has the entire winter season based at that port. Instead, AIDAprima will come straight from the shipyard to Europe in April 2016 - a year late - and take up her northern European itineraries from 30 April. She will be the first Aida ship to be based year-round in Hamburg.
机译:7月下旬宣布,日本三菱重工为Aida邮轮建造的两艘船中的第一艘AIDAprima(122,500总吨)已经交付了六个月,这将再推迟六个月。结果,从日本到迪拜的处女航已被取消,该港口的整个冬季也被取消。取而代之的是,AIDAprima将于2016年4月从船厂直达欧洲-较晚一年-并从4月30日起承接她在北欧的行程。她将是常年在汉堡工作的第一艘Aida船。

著录项

  • 来源
    《Ships monthly》 |2015年第11期|13-13|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号