首页> 外文期刊>Ships monthly >New profile for layer
【24h】

New profile for layer

机译:图层的新配置文件

获取原文
获取原文并翻译 | 示例
       

摘要

Cable layers are taking on a far different profile from that of their predecessors as the laying of electrical cables for wind farm installations rather than communications cables becomes their primary employment. Such is Siem Offshore's $85 million Siem Aimery, being completed by Poland's Remontowa Shipbuilding. Because wave-related operability issues have been a major factor in delaying cable lay operations, the newbuild features a hull design that is intended to permit operations in wave heights up to 3m using a diesel-electric propulsion system that will provide power to two azimuth propulsion thrusters, two tunnel thrusters and one retractable thruster.
机译:电缆层与以前的电缆层截然不同,因为风电场安装的电缆而不是通信电缆的铺设成为其主要工作。这就是Siem Offshore价值8500万美元的Siem Aimery,由波兰的Remontowa Shipbuilding完成。由于与波浪有关的可操作性问题一直是延迟电缆敷设操作的主要因素,因此该新船体采用船体设计,旨在使用柴油-电力推进系统在最高3m的波浪高度下进行操作,该系统将为两个方位角推进提供动力推进器,两台隧道推进器和一台可伸缩推进器。

著录项

  • 来源
    《Ships monthly》 |2015年第9期|18-18|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 01:42:23

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号